Final Report on “Domestic Manufacturing Capacity & Potential
Cyber Security Challenges in the wind sector and Way Forward”
March, 2024
2
Acknowledgments
This report was prepared under the chairmanship of Dr. V. K. Saraswat, Member (Energy) &
guidance of Sh. Rajnath Ram, Adviser (Energy), NITI Aayog. We extend our sincere gratitude to
Ministry of Power (MoP), Ministry of New and Renewable Energy (MNRE), Central Electricity
Authority (CEA), Ministry of Electronics and Information Technology (MeitY), National Institute
of Wind Energy (NIWE), Indian Computer Emergency Response Team (CERT-In), Solar Energy
Corporations of India (SECI) and National Critical Information Institute of Infrastructure
Protection Centre (NCIIPC) for their contribution & guidance for preparing the report.
We acknowledge all other stakeholders who contributed in the successful completion of the Final
Report on "Domestic Manufacturing Capacity & Potential Cyber Security Challenges in the Wind
Sector and Way Forward".
3
Contents
Executive Summary ...................................................................................................................................... 4
Wind Energy Potential .................................................................................................................................. 6
Table 1: Potential of Wind by windy states .......................................................................................... 6
Policy incentives for domestic wind manufacturing ..................................................................................... 7
Domestic Manufacturing Capacity of Wind Turbine Component ................................................................ 7
Table 2: Status of Domestic Manufacturing Capacity .......................................................................... 7
Table 3: Domestic Manufacturing Capacity: Local & Import share .................................................... 8
Table 4: Domestic Manufacturing Capacity: Critical Minerals Availability Analysis ......................... 9
Support offered to manufacturers: .............................................................................................................. 12
The Way Forward for improving Domestic Manufacturing Capacity in the Wind sector.......................... 12
Cyber Security Framework in India. ........................................................................................................... 13
The Present Cybersecurity Testing Mechanisms ........................................................................................ 16
The Way Forward ....................................................................................................................................... 17
Annexure-A................................................................................................................................................. 20
Annexure -1 ................................................................................................................................................ 24
Annexure -2 ................................................................................................................................................ 32
4
Executive Summary
This comprehensive report delves into the dynamic landscape of India's wind energy sector,
aiming to address critical challenges of cyber security and capitalize on opportunities. The report's
primary focus is to raise specific concerns of cyber security due to import (specially from China)
of the Wind Sector components by Wind Turbine Original Equipment Manufacturers (OEMs).
The main issues are OEMs data collection servers which are situated outside of the country,
vulnerabilities in data and power system network operations due to updating operating software’s
of Wind Plant devices by OEMs without any permission from Grid-Operator and MNRE etc.
As the wind energy sector globally achieves substantial growth, reaching a cumulative installed
capacity of 906 GW in 2022 with a notable 9% year-on-year increase, India emerges as a crucial
player. Ranked fourth globally in installed wind power capacity, India plays a pivotal role in
achieving ambitious targets for non-fossil fuel capacity and Net Zero by 2030 and 2070,
respectively.
Despite the significant potential highlighted by the National Institute of Wind Energy, only 6% of
the assessed capacity has been realized, signalling room for substantial growth. The report
underscores the robust policy framework supporting domestic wind manufacturing, coupled with
the challenges faced in the production of critical components, leading to significant import
reliance.
A noteworthy aspect is the escalating competition with China, holding a 61% share of global wind-
turbine assembly capacity. The report addresses challenges faced by the RoDTEP scheme, aimed
at boosting India's exports, and emphasizes the exclusion from the Advance Authorization scheme
and increased costs in the supply chain.
The second half of the report delves into the challenges and opportunities surrounding India's wind
energy sector, with a focus on domestic manufacturing capacity and potential cybersecurity
threats. The key findings and recommendations are summarized as follows:
i. Manufacturing Capacity Challenges: The report identifies critical challenges in the
manufacturing of key components such as blades, towers, gearboxes, and bearings. Issues
such as the lack of availability of non-standard sizes, quality concerns, and inconsistent
demand have resulted in a significant reliance on imports, hindering the growth of domestic
manufacturing capacity.
ii. Critical Minerals Availability Analysis: A detailed analysis of critical minerals required
for wind turbine components reveals challenges in the availability of materials such as
balsa wood, specialized resins, and steel plates with non-standard specifications. Import
dependence is prevalent, especially for components like tower flanges and castings, posing
a risk to the sustainability of the industry.
iii. Cybersecurity Threats and Risks: Wind turbines' capability to exchange information
through Power Plant Controllers poses a significant cybersecurity threat. The PPC (Power
Plant Controller) software is of critical importance and associated with risks- used in the
device which connects the wind farm directly to the national/state grid. PPC OEMs of
5
foreign origin especially neighboring countries, need to be examined and call needs to be
taken for their suspension while not adhering to the protocol. The report emphasizes the
potential risks associated with cyberattacks on wind turbines, including the compromise of
grid operations, especially when managed remotely by owners stationed outside India. The
need for robust security measures is crucial to safeguard national infrastructure.
iv. Competitive Landscape and Incentives: The global competitive landscape is discussed,
with China emerging as a major competitor in wind equipment exports. The report outlines
the incentives provided by the Indian government, such as the Remission of Duties and
Taxes on Export Products (RoDTEP) scheme, while acknowledging challenges, including
the exclusion from the Advance Authorization scheme and increased manufacturing costs.
v. Mandatory Certification of foreign Software/Hardware: Certification and approval of
all IPRs, software and device/hardware from the OEMs of foreign origin especially from
neighboring countries by Central Electricity Authority of India (CEA), Ministry of
Electronics and Information Technology (MeitY) and Standardization Testing and Quality
Certification (STQC).
vi. Budgetary provision for building infrastructure to address cyber-Security threats.
Every Utility must appoint CISO (chief information security officer) who should reside in
India and report for compliance to the proposed independent agency on the Power Sector
Cyber Security aspects.
vii. All the OEMs of the Wind Sector needs to locate and re-locate their Data Centre and
Research & Development Centre inside the country failing which OEMs should be de-
bar from participating in the tenders and supplying the items in the Country. Ministry of
New and Renewable Energy should prepare timelines for relocation of the Wind Sector
OEMs Data, R&D Centre inside the country.
In conclusion, this report advocates for a multi-pronged approach integrating policy interventions,
manufacturing support, and robust cybersecurity measures. With a distinct emphasis on the rising
influence of Chinese OEMs and the associated security concerns, the report urges stakeholders to
collaboratively address challenges and harness opportunities, ensuring India's sustained growth in
renewable energy and cybersecurity resilience.
6
Final Report on “Domestic Manufacturing Capacity & Potential Cyber Security
Challenges in the wind sector and Way Forward”
Wind Energy Potential
As per the Global Wind Energy Council Report 2023, the total cumulative wind power installed
capacity globally stood at 906 GW in 2022, with YoY growth of 9%. Since 2010, more than half
of all new wind power capacity was added outside the traditional markets of Europe and North
America, mainly driven by the continuing boom in China and India. According to the GWEC’s
Global Wind Report, 2023, the top five countries with respect to Installed wind power were China
(333 GW), followed by EU (225 GW), the US (144 GW), Germany (58 GW) and India (44.73
GW).
2. India is the South Asia leader in wind energy sector and the sector growth is largely led by
the indigenous wind power manufacturing industry and now ranks fourth in Installed wind power
capacity in the world. Wind energy is crucial to achieve 50% installed capacity from non-fossil
fuel-based energy resources by 2030 and Net Zero by 2070. India has significant potential for both
onshore and offshore wind energy production. With the continuous efforts, India has developed
around 17.25 GW of domestic wind manufacturing capacity (Table-1).
3. The government, through National Institute of Wind Energy (NIWE), has installed 993
wind-monitoring stations all over the country for assessing the potential. The latest assessment
indicates the wind power potential of 302.25 GW, 695.50 GW and 1,164 GW at the hub height of
100 meters,120 meters and 150 meters respectively and most of these potentials exist in the seven
windy States as listed in the table below:
Table 1: Potential of Wind by windy states
S.No. State Wind Power
Potential at 100
mtr agl (GW)
Wind Power
Potential at 120 mtr
agl (GW)
Wind Power
Potential at 150
mtr agl (GW)
1 Andhra Pradesh 44.23 74.90 123.33
2 Gujarat 84.43 142.56 180.79
3 Karnataka 55.86 124.15 169.25
4 Madhya Pradesh 10.48 15.40 55.42
5 Maharashtra 45.39 98.21 173.86
6 Rajasthan 18.77 127.75 284.25
7 Tamil Nadu 33.80 68.75 95.10
Total (7 windy States) 292.97 651.72 1082
Other states 9.28 43.78 81.85
All India Total 302.25 695.50 1163.85
7
4. Only 6% of India’s wind potential has been capitalized through the wind farms. The onshore
wind stations likely to occupy more land area and installation of more wind turbines may lead to
RoW issues and may affect realization of wind potential at large scale.
5. India has 7600 km of coastline. The initial estimates indicate the potential of offshore wind
in Gujarat and Tamil Nadu coasts alone is around 70 GW. The offshore wind potential of Gujarat
and Tamil Nadu stands at 36 GW and 35 GW respectively. Currently, the share of non-fossil fuels
in total electricity installed capacity stands at 43% which includes wind installation of 44.73 GW
as on Dec, 2023. To achieve the 45% emission intensity reduction by 2030, we have to install
about 120-140 GW cumulative wind capacity by 2030 under the net-zero scenario.
Policy incentives for domestic wind manufacturing
6. To encourage domestic manufacturing of Wind Turbine Generators (WTG), the Government
provides financial incentives like custom duty exemption on critical components, waiver of Inter-
State Transmission System charges for the projects to be commissioned by 30
th
June, 2025.
Renewable Purchase Obligations (RPO) up to 2030 has been also notified. Standard Bidding
Guidelines are in place for tariff based competitive bidding process for procurement of Power from
Grid Connected Solar PV and Wind Projects. Government has also issued orders that power shall
be dispatched against Letter of Credit (LC) or advance payment to ensure timely payment by
distribution licensees to renewable energy generators.
Domestic Manufacturing Capacity of Wind Turbine Component
7. India is a major wind turbine manufacturing hub with the presence of leading global and
Indian companies such as Suzlon Energy Ltd., Siemens Gamesa Renewable Power Private Ltd.,
and GE India Industrial Private Ltd. With over 17 wind turbine manufacturing companies’ annual
production capacity in country exists about 15,000 MW. These companies export wind turbines
and blades to Australia, Brazil, Europe, USA and other countries. Table 2 summarizes the Annual
domestic manufacturing capacity by Manufacturers.
Table 2: Status of Domestic Manufacturing Capacity
Manufacturer
Country of
origin
Turbine size
(MW)
Annual
Manufacturing (MW)
Suzlon Energy Ltd. India 2.1 - 3.0 4,500
Vestas Wind Technology Denmark 2.0-3.6 3,000
Siemens Gamesa Renewable
Power
Spain 2.0-3.6 4,000
Envision Wind Power
Technologies
China 2.5-3.3 1,000
8
Senvion Wind Technology Germany 2.3-2.7 1,000
Nordex India Pvt. Ltd. Spain 3.0 1,000
GE India USA 2.3-2.7 1,000
Inox Austria 2.0-3.0 1,000
Emergya Wind Turbine The Netherlands 1.0 250
Others 500
Total 17,250
8. Table 3 provides the status of domestic manufacturing capacity of various components.
Towers, Blades and Gearbox account for almost 60% of the total cost of WTG set-up. Table-4
provides details of critical materials required for each component and their domestic availability.
The table highlights availability of non-standard sizes, quality, and lack of consistent demand has
resulted imports. A thrust is required to promote domestic manufacturing.
Table 3: Domestic Manufacturing Capacity: Local & Import share
Name of the
Wind Turbine
Component
Total
Manufacturing
Capacity
(Per annum)
% Cost Share of
Wind Turbine
Generator
(WTG) setup
100% local content
by OEMs
Imported by
major OEMs
(% varying)
Towers 5,200 MW 26% Vestas, Inox,
Envision, Suzlon, GE
Siemens,
Gamesa
Blades Not available 22% Vestas, Inox,Senvion,
GE, Siemens,
Gamesa, Suzlon,
Envision
-
Gearbox 8,000 MW 12% Suzlon, Siemens,
Gamesa, GE
Vestas, Envision,
Inox, Senvion
Power
Converters
Not available 5% GE, Siemens,
Gamesa, Vestas, Inox
Envision,
Suzlon, Senvion
Generators Not available 4% Suzlon, GE, Siemens,
Gamesa
Vestas, Envision,
Inox, Senvion
Transformers Not available 3.6% GE, Siemens,
Gamesa, Vestas, Inox,
Senvion, Suzlon
Envision (only
Aux.
Transformer)
9
Castings 11,590 MW 27. 4%
Yaw Drives 10,000 MW
Pitch Drives 5,000 MW
Others (Main
Shaft, Rotor
bearing etc)
Not available
1. *Domestic component share of Suzlon S120 Model is approximately 85%.
2. Envision is sourcing Blades from 2 plants in India i.e., LM Wind Power in Dabaspet
(Karnataka) and Halol (Gujarat). Notably, Envision has now set up a new Blades factory
in Trichy (Tamil Nadu) and will commence production shortly.
Table 4: Domestic Manufacturing Capacity: Critical Minerals Availability Analysis
S.
No.
Component Critical metals/minerals Availability Status
1 Blade Balsa wood, Foam, Pultruded carbon
fibre, Specialized Resins (Adhesive
resins), High Modulus and Glass
Fibres
Manufacturers fully import Carbon
& Balsa, while rest of the components
are locally purchased and at times
Resin is partially imported based on
new basis requirement.
2 Tower Steel plates Indian vendors are not ready to
supply non-standard sizes due to low
volume which do not justify capex
investment.
Indian Steel Producers can produce
such specifications. However, they
are not producing due to lack of
consistent demand.
Requires steel plates with non-
standard specifications. No specific
size available from Indian suppliers,
hence imported from South Korea,
China.
10
Tower Flanges and Paint No domestic supplier for wind
turbines with diameter > 5.5 m.
However domestic suppliers are
available to supply tower flanges upto
a diameter of 5 m.
Some manufacturers procure all the
rings locally, however, some players
import rings from low -cost
neighboring countries resulting in
underutilized capacity in India. Low
volumes make it difficult for Indian
suppliers to upgrade their facilities to
supply tower flanges forever
increasing size of new turbine
models.
Sufficient quantity of paint is locally
available; as multiple suppliers are
available in India. Over the years,
quality & consistency issues have
improved to a great extent.
3 Bearings Specialized alloy steel Quality related issues in domestic
sector
4 Forging Main Shaft If the main shaft is casted then it is
available in India otherwise it is
imported (mostly from Asia
pacific/China).
Forged rings (for pitch bearings and
slew/yaw
bearings)
There are no domestic steel supplier
manufactures to supply the
continuous cast bloom steel with
large diameter.
(Imported from China, South Korea,
Italy)
Tower
Flanges Special alloy steel/Concast
(Continuous cast) with higher
diameter
11
5 Casting Wind turbine Castings and Gear box
Castings
As per inputs received from industry,
most manufacturers procure all the
castings locally. However, some
players import from low-cost
neighboring countries due to factors
like cost competitiveness and
implementing global sourcing
method.
Low volumes make it difficult for
Indian suppliers to upgrade the
existing facilities to supply castings
for ever increasing size of new
turbine models.
6 Gear box Not available There are three domestic
manufacturer /supplier of gearbox
i.e.M/s. Flender Drives Private
Limited (Winergy), M/s. ZF Wind
Power Coimbatore Private Limited
and M/s. NGC Transmission,
Chennai. NGC exports 100% of its
products, Flender product is not
suitable for Suzlon WTG models and
ZF gearboxes are supplied from SEZ.
9. The Ministry of New and Renewable Energy (MNRE) cnotifies the Revised List of Models
& Manufacturers (RLMM) from time to time. This list consists of the certified types and quality
of wind turbines models/manufacturers eligible for installation in the country. As per updated
RLMM list of November 2023, out of 28 wind turbine models/ 12 manufacturers, there is only
one Chinese company namely; M/s Envision Wind Power Technologies India (Pvt) Ltd, which is
a subsidiary of Envision Energy (Jiangsu) Co. The multinational companies host the data at their
head office located outside India. For such OEMs, the data collection servers and research &
development operations are normally based outside India. Such practice leads to security concern
with regards to vulnerability of data and network operation.
10. Wind Turbines are capable of exchanging information with Utility Operators and
Aggregators through a device called the Power Plant Controller (an intelligent cyber-physical
device) and because of this functionality, they pose a risk to cyberattack and may render grid
operations insecure. Exploiting this attack vector, the attacker can enter the network and carry out
lateral movement to other high value assets. Some of the owners of these RE resources are
stationed outside India and manage the operations of these devices remotely, this can lead to major
threat on the National Grid as well as breach of critical data.
12
Support offered to manufacturers:
11. China is India's biggest competitor for wind equipment exports, accounting for upto 61% of
global wind-turbine assembly capacity in 2023 whereas India's share was 32%. Chinese wind
industry developments based on huge incentives provided by the Chinese government and also
rebates on export tax to make them globally competitive. Exporters based in China are required to
pay export value-added tax (VAT) on goods that they ship abroad and can get an export tax rebate
ranging from 6% to as high as 16% (2018 notification).
12. RoDTEP rates across the industries in India: The new Remission of Duties and Taxes on
Export Products (RoDTEP) scheme effective from 2021 aims at boosting India's exports and global
competitiveness by compensating various taxes like VAT and electricity duty. It covers over 8500
tariff lines across sectors like marine, agriculture, gems & jewelry with incentive rates varying
from 0.5% to 4%, replacing the earlier Merchandise Exports from India Scheme (MEIS). However,
exclusion of Advance Authorization scheme on duty-free imports used for exports is likely to
impact exporters. Amongst various sectors, textile products, food and agri products have received
maximum favorable rates under RoDTEP, that of upto 4.3%. Metals and automobile sector exports
receive the rebates of upto 2.3% whereas exports in wind industry get rebate of 0.8% only under
the RoDTEP scheme plus OEMs have to face BCD rates at an average of 10% (excluding cess and
surcharges) on raw material or components to manufacture WTG. Recent supply chain disruptions
with increased fuel cost have also distorted the market and the cost of manufacturing has gone up
and thus OEMs face challenges of less margins
13. The Way Forward for improving Domestic Manufacturing Capacity in the Wind
sector
i. Announcement of bidding calendars - Annual wind capacity bidding calendars needs to
be announced in advance so that the industry is aware and visualize potential business
opportunities. It needs to ensure that the work on state specific bids should be such that
crowding is avoided in high wind states. MNRE dated 31.03.2023 has already issued a
bidding trajectory for renewable energy power projects wherein bids for RE capacity of 50
GW per annum, with at least 10 GW per annum of wind energy capacity are to be issued
each year from financial year 2023-24 to FY 2027-28.
ii. Enforcement of RPO trajectory: Ministry of Power, under the Energy Conservation Act
2001, specified minimum shares of renewable energy consumption by designated
consumers. This applies to electricity distribution licensees, open access consumers, and
captive users, as a percentage of their total energy consumption. The notification also
specifies that any shortfall in specified renewable energy consumption targets shall be
treated as non-compliance and penalty shall be imposed as such rate specified under sub-
section (3) of section 26 of the Energy Conservation Act, 2001.
iii. Standard size components: Some of the components imported due to non- availability of
standard sizes, quality, and lack of consistent demand. With small modification in the
existing manufacturing units, the industry can be catered through existing manufacturing
units. A scheme for ramping up domestic manufacturing capacity for the components of
desired sizes such as forged rings (for pitch bearings and slew/yaw bearings), tower
13
flanges (Special alloy steel/Continuous cast) with higher diameter, main shaft, steel
plates can be manufactured domestically.
iv. A major cybersecurity threat remains with power Plant Controller (an intelligent cyber-
physical device) which is being imported. A committee needs to be constituted with
representatives from Industry, the Ministry of Power/Ministry of New and Renewable
Energy, relevant institutions, and Academia to develop a roadmap for domestically
manufacturing Power Plant Controller and SCADA systems.
v. Enabling finance: Crowd sourcing of fund at low cost-long tenor and also deploying
innovative tools like Blended Finance, Green Bonds, etc. are needed to boost the
manufacturing in the RE sector.
vi. GST is not levied on sale of electricity. Hence, the corporates and industrial customers,
are unable to get a GST pass through. This is also one of the factor for discouraging
investment in the renewables. Bringing renewable electricity under GST regime for
commercial and industrial customers will accelerate adoption of renewables in C&I
(commercial and industrial) segment.
Cyber Security Framework in India:
14. The Existing Cyber security framework for Wind energy and Power systems deployed in
the wind sector is summarized below:
i. Central Electricity Authority (Technical Standards for Communication System in
Power System Operation) Regulations, 2020: As per regulation 14 of aforesaid
Regulations, all users and control centers connected to the communication system shall
have robust programs in place to adequately and continuously manage cyber security risks
that could have adversely impact power system communications infrastructure. Further
said cyber security program shall address the following, namely: -
a) Compliance with provisions of the Information Technology Act, 2000 (21 of
2000) and National Cyber Security Policy, 2013 as amended from time to time;
b) Implementation of the National Critical Information Infrastructure Protection
Centre (NCIIPC) Guidelines;
c) Implementation of guidelines and advisories issued by Computer Emergency
Response Team (CERT India) and applicable Sectoral Computer Emergency
Response Team (CERT); and
d) Compliance to the Central Electricity Authority (Cyber Security) Regulations, as
and when they come into force.
ii. Central Electricity Authority (Technical Standards for Connectivity to the Grid)
(Amendment) Regulations: CEA (Cyber Security in Power Sector) Guidelines, 2021 under
the provision of Regulation (10) of the Central Electricity Authority (Technical Standards
for Connectivity to the Grid) (Amendment) Regulations, 2019 has been issued by CEA on
7
th
October 2021. It has 14 articles related to cyber security that need to be complied with
14
by Responsible Entity, including Generation utilities (Hydro, Thermal, Nuclear, and RE) and
Generation Aggregators. The guidelines mainly cover following issues about the Cyber
Security:
Cyber Security Policy, CISO appointment, CII identification, Electronic Security Perimeter,
Cyber Security Requirement, Cyber Risk Assessment & Mitigation Plans, phasing out of
Legacy System, Cyber Security training, Cyber Supply Chain risk management, Cyber
Security Incident Report and Response Plan, C-CMP, Sabotage Reporting, Security and
Testing of Cyber Assets and Cyber security Audit".
A brief about each of the 14 articles of the guidelines is highlighted at Annexure- 1.
iii. Framework applicable for Wind turbine manufacturers: Ministry of Power (MoP) has
issued an order dated 02.07.2020 in which following directions were issued:
a) All equipment, components, and parts imported for use in the power Supply System
and Network shall be tested in the country to check for any kind of embedded
malware/trojans/cyber threat and for adherence to Indian Standards.
b) All such testing shall be done in certified laboratories that the MoP will designate.
c) Any import of equipment/components/parts from "prior reference" countries as
specified or by persons owned by, controlled by, or subject to the jurisdiction or the
directions of these "prior reference" countries will require prior permission of the
Government of India.
d) Where the equipment/components/parts are imported from "prior reference"
countries, with special permission, the protocol for testing in certified and
designated laboratories shall be approved by the MoP.
e) MoP has issued order dated 24.12.2021 notifying the List of Designated laboratories
for Cyber Security Conformance testing of imported equipment for which standards
for communication protocols and security conformance and testing protocols to be
followed by the buyers (like utilities) including import from prior reference
countries.
f) So far there is no testing capability to detect the embedded malware and
hardware trojan at chip level at any of the testing facilities in the country on
commercial level. The malicious code in the application & OS can be detected
through the testing facilities developed at (Standardization Testing and Quality
Certification) STQC, if the supplier makes the source available.
iv. The Ministry of Power has created 6 (six) Sectoral Computer Emergency Response Team
(CERTs) namely Thermal, Hydro, Transmission, Grid Operation, RE and Distribution for
ensuring cyber security in Indian Power Sector. SECI has been designated as CERT-RE.
Nodal officers of the sectoral CERTs co-ordinate with their respective constituent utilities for
nomination of utility level CISO and alternate CISO, preparation and implementation of
utility specific Cyber Crisis Management Plan (C-CMP) and for early identification of their
Critical Information Infrastructures (CIIs). At bottom level, nominated CISOs of Power
Utilities work in co-ordination of respective CERTs and are responsible for implementation
of Cyber Security Activity in their organization. The capacity of SECI needs to be
strengthen to take up the role of CERT-RE being a critical sector.
15
15. As per MOP dated 05th April, 2023, a Computer Security Incident Response Team (CSIRT)-
Power i.e., CSIRT-Power, specifically for the power sector has been setup at Central Electricity
Authority. The CSIRT-Power is an extended arm to Indian Computer Emergency Response
Team (CERT-In) (Annexure -2). All the utilities in the Power Sector (Generating Companies,
Load Dispatch Centers, Transmission Licensees, Distribution Licensees) reports to and comply
with the instructions of CSIRT-Power along with CERT-In (CERT-In being the national Nodal
Agency in the area of Cyber Security), while dealing with the activities pertaining to Cyber
Security of Power Sector.
The key activities of CSIRT-Power are given below.
▪ Laying down the Cyber Security framework and protocol for the Power Sector;
▪ Laying down Standard Operating Procedures for Cyber Security;
▪ Reviewing the Cyber Security arrangements in the different wings from time to time and
strengthening such arrangements;
▪ Implementation of Trusted Vendor System;
▪ Drafting of Model Contractual Clauses for Cyber Security;
▪ Analysis of Cyber Security Incidents;
▪ Cyber Security Testing;
▪ CISO Workshop;
▪ Analysis, follow-up & action on Alert and Advisories, issued by NCIIPC, CERT-In and
MHA;
▪ Capacity development for using Vulnerabilities Scanning tools;
▪ Security Control Selection & Tailoring Process; and
▪ Vetting of Cyber Testbed Proposals
16. To implement cyber security best practices in the power sector, the Information Sharing and
Analysis Centre (ISAC-Power) was established as a central coordinating agency for sharing and
analyzing cyber security incidents across six sectoral CERTs. As a central information pooling
and sharing platform, the ISAC-Power portal requires mandatory registration by wind sector
developers to enable information sharing on cyber security issues.The cyber security program shall
address the following, namely:
a) Compliance with provisions of the Information Technology Act, 2000 (21 of 2000) and
National Cyber Security Policy, 2013 as amended from time to time;
b) Implementation of the National Critical Information Infrastructure Protection Centre
(NCIIPC) Guidelines;
c) Implementation of guidelines and advisories issued by Computer Emergency Response
Team (CERT India) and applicable Sectoral Computer Emergency Response Team
(CERT); and
d) Compliance to the Central Electricity Authority (Cyber Security) Regulations, as and
when they come into force.
e) Compliance to the Central Electricity Authority (Cyber Security in Power Sector)
Guidelines, 2021.
f) Report to and comply with the instructions of CSIRT-Power, CEA along with CERT-
In (CERT-In being the national Nodal Agency in the area of cyber security), while
dealing with the activities pertaining to Cyber Security of Power Sector.
16
The Present Cybersecurity Testing Mechanisms
17. Ministry of Power (MoP) vide order no 9/16/2016 -Trans-Part (2) dated 18
th
November
2020 notified that the equipment/components/parts may be imported from “prior reference”
countries, subject to the following conditions.
a) The imported equipment must be examined by CPRI or appropriate testing laboratory on
arrival
b) The testing should also ensure that testing equipment do not have any adverse impact
(both on account of cybersecurity as well as quality point of view) on transmission Grid.
c) The other shortcomings as mentioned below need to be resolved at the earliest including
the infrastructure build up for testing
i. STQC tests until EAL-4, which is insufficient to rule out any malicious content
embedded in software/hardware.
ii. DRDO and ISRO has their own testing mechanism like security loop analysis which
is for their own security and do not have breadth for commercial testing of power
sector equipment.
iii. Some of the OEMs like Siemens and Hitachi have their own in-house testing facilities
and have concerns of IP (Intellectual Property).
iv. The present testing available at CPRI and other testing labs are not in a position to
certify any security target as cyber secure.
i. Until the setting up of an adequate certification facility in India, a digitally signed self-
declaration can be submitted by the OEM w.r.t. conformance to the IEC 62443-4 standards
during design and manufacture of the equipment/system. In this regard, MoP has issued
directives and has proopsed to up a committee to finalize the format and criteria for
accepting the self-certification submitted by OEM.
ii. MoP dated 08.06.2021 notified Central Power Research Institute (CPRI) as the nodal
agency for testing power system equipment for cyber security. This order indicates List of
designated laboratories for cyber security conformance testing. For ensuring supply chain
cybersecurity the essential cyber security tests needs to be carried out during Factory
Acceptance Test (FAT) and Site Acceptance Test (SAT)
iii. To address the issue of cyber supply chain risk management, MoP has worked out a scheme
of trusted vendor system for power sector and has initiated action on model
contractual clauses to be incorporated in the bid for procurement of ICT based devices.
iv. While granting the connectivity to the RE plant CTU must ensure that necessary provision
for adherence to the trusted vendor procedure by the RE utility requesting for the
connectivity is included in the relevant agreement process. While allowing the first-time
charging of the RE generator, compliance with the above procedure shall be submitted to
the concerned LDC. Model Contractual clauses on cybersecurity to be mandatorily
included in the bid documents.
17
The Way Forward
i. Mandatory Certification of foreign Software/Hardware: The Grid Controller of India
Limited (POSOCO) must obtain all relevant certificates and IPRs, software and
device/hardware from the OEMs of foreign origin especially from neighboring countries and
send them for certification and approval by Central Electricity Authority of India (CEA),
Ministry of Electronics and Information Technology (MeitY) and Standardization Testing and
Quality Certification (STQC) as per applicable rules/guidelines. Clearances from the above
three organizations or any other relevant organizations as deem fit, need to be made
mandatory prior to permission of connectivity to the national or state grid as specified below:
a) OEMs need to incorporate security related requirements for SDLC (Secure
Development Life Cycle) in lines with ISO 27002:2022 controls i.e. (8.25 – 8.30), and
as per clause mandated in the proposed MCC (Model Contractual Clauses) procurement
requirements.
b) National Institute of Wind Energy (NIWE) may be instructed to follow the exact
protocol as mentioned above at the time of commissioning of wind sector projects.
ii. As per Revised List of Models & Manufacturers (RLMM) policy, OEMs in wind power sector
need to get approval for their WTG as either Nacelle assembled or Nacelle manufactured in
India (The Nacelle is the main housing of the turbine, which is assembled with the yaw drive,
it is directly mounted on the tubular tower. The main carrier is a single cast frame that permits
stable mechanical behavior and performance.). This must be modified so that RLMM approval
is only given when major equipment like Nacelle (Gear Box, Generator etc.), Blades, Tower,
Hub, Controller are manufactured in India.
iii. The guidelines need to include a minimum requirement of local content of 60% by value
mandatorily sourced from India
iv. The PPC (Power Plant Controller) software is of critical importance and associated with
risks- used in the device which connects the wind farm directly to the national/state grid. PPC
OEMs of foreign origin especially neighboring countries, need to be examined and call needs
to be taken for their suspension while not adhering to the above protocol. One of the mitigation
measures for arresting this concern is the deployment of Layer 7 Firewall or NGFW (Next
Generation Firewall) with DPI capability capable of understanding ICS protocols at the POI
(Point of Interconnection) at utility end. The NGFW firewall must only allow traffic related to
ICS communication protocol (say IEC 104 etc.) and block the rest of traffic flowing through
the communication link to the designated control center wherefrom the control actions on the
PPC are being performed.
a) OEMs provide a means to disable the “Server’s” “WRITE CAPABILITIES”, and putting
in to a “READ-ONLY” mode across all its various protocol-based implementations (Like
SOAP/ HTTP, OPC-XML DA implementations etc.).
b) For all the implementations of Wind Power Plants where the SCADA cum PPC is hosted
off-site and away from the actual wind farm site, the software operators must only be
granted “READ ONLY” rights so that they must not be able to control the plant operations
remotely
18
c) The SBOM (Software Bill of Materials) must be part of essential requirement for
procurement of SCADA/PPC software to contain the cyber supply chain risks.
d) Further, following controls & practices must be implemented
i. Blocking IPs by Implementing the Geo Fencing service at the perimeter firewall.
ii. Mandating the MFA (Multi Factor Authentication) for any remote VPN connectivity
request.
iii. Segregating the IT/OT network.
iv. Allowing Only whitelisted devices/IPs through such firewalls.
v. Implementation of IDS/IPS solutions
vi. Implementing Principle of Lest Privilege and Least Access.
v. The equipment supplier and the developer of the wind power plant needs to provide an
undertaking with enough backup information to the Grid Controller of India (POSOCO),
ensuring that there is no access or control of any device, software, IPR or data of any wind
turbine from outside of India under any circumstances and all data should be positioned strictly
to the servers located in India. Both parties i.e., the equipment supplier and the developer of
the wind power plant must establish their server, data center, R&D center, design center etc.
inside the country. Any company violating these norms must be penalized and debar from all
the business & engagement in the country. A timeline must be set for those company, which
has already established its data center & server outside country for shifting data server to India.
vi. Mandatory Cyber Security audits for wind farms at regular intervals: There should be
firewalls in each windfarm for accessing control and all the turbine components which
communicate through IP (like PLC/Switch/Convertor, Pitch control) and have access control
through VPN. Further, Cyber Security audits for wind farms should be a regular exercise.
vii. Institutionalization of AI/ML based threat detection systems: AI/ML based threat
detection, end point detection & response tools, and vulnerability management modules to
build a cyber-resilient environment may be explored.
viii. As per Article 14, CEA (Cyber Security guidelines for Power Sector), 2021, IT audit has been
mandated half yearly basis while OT audit is mandated annually through a Cert-In empaneled
auditors with costs of such audits to be borne by the respective organization. The Ministry
of New and Renewable Energy also needs to enforce these guidelines for third-party
audit for Power System infrastructure cyber security (Solar & Wind farm – grid
interactive inverters, OEMs software, data center, communication devices, etc.) in
consultation with Ministry of Power. The accreditation body for ISO 27001 Certifications
must be an INDIAN agency in view of the critical systems being audited.
ix. MNRE/Ministry of Power needs to create a separate budgetary provision for building
infrastructure to address cyber-Security threats. Every Utility must appoint CISO (chief
information security officer) who should reside in India and report for compliance to the
proposed independent agency on the Power Sector Cyber Security aspects.
x. Wind power generation assets need to be classified as critical energy infrastructure that
are required to be built, operated and maintained by experienced, reputable companies on a
19
trusted technology track record, with accountable information technology systems,
international standards and procedures.
xi. Wind turbine type certification is to be conducted by a Renewable Energy Certification
Body (RECB) via the IECRE (IECRE is a Conformity Assessment System based on
International Standards prepared by the IEC (International Electrotechnical Commission) for
equipment and services used in renewable energy (RE) applications. The system aims to
facilitate the international trade of equipment and services in the marine, solar photovoltaic
(PV) and wind energy sectors, while maintaining the required level of safety. In addition to
IECRE scheme, the IS/IEC 61400-22 scheme published by Bureau of Indian Standards (BIS)
may also be referred and allowed for wind turbine type certification. Also, a 3rd party
certificate of compliance is required to ensure electromagnetic compatibility of the asset’s
equipment and systems, so that they do not introduce intolerable electromagnetic disturbance.
xii. Promote cyber security research and development: Due to ever evolving threats, cyber
security research and development need to be highly important to progress towards the long-
term vision for cyber-resilient wind energy systems. The research areas can be identified in
consultation with MEiTY.
xiii. Adoption of best practices to promote basic cyber hygiene which includes training personnel
in cyber security, creating cyber asset lists, Onboarding Public IPs assigned to the
organization with the CSK, implementing various requirements as stated in the CEA (Cyber
Security in Power Sector) Guidelines, 2021 and developing better means of communicating
cyber threat and vulnerability information. A cell needs to be created and to be made
responsible for such activity.
xiv. The RE critical equipment /software suppliers must declare and provide self-
certification, not limited to the following:
a) Malware detection techniques used before final packaging and delivery (e.g., scanning
finished products for malware.
b) Practices to manufacture, deliver and service products without counterfeit components.
c) Secure transmission and handling controls to lower risk of tampering
d) Secure coding practices used to avoid common errors leading to vulnerabilities (e.g.,
input validation, compiler flags)
xv. Reference architecture for RE sector: The reference architecture for renewable energy sector
needs to be finalized. Currently draft architecture by MoP is enclosed as per Annexure-A, that
needs to be finalized in consultation with MNRE.
xvi. All the OEMs of the Wind Sector needs to locate and re-locate their Data Centre and
Research & Development Centre inside the country failing which OEMs should be de-bar
from participating in the tenders and supplying the items in the Country. Ministry of New and
Renewable Energy should prepare timelines for relocation of the Wind Sector OEMs Data,
R&D Centre inside the country.
20
Annexure-A
The Architecture for solar and wind plants are generally divided in three areas as follows;
1. Solar PV Generator/ Wind Generator
2. Inverter
3. AC Switchyard (SAS)
All the above-mentioned areas report to centralized SCADA system for Control and
monitoring of the respective Solar Park/ Wind Park
Solar PV Generator: Solar PV generator area comprises of number of PV panels spread over
the wide area of land. PV panels are connected (series/ parallel configuration) to make
string. SCADA system monitors the string of the park. In case rotating mounting module
structures are used, the PLC related to MMS (Module Mounted Structure) is to be monitored
through the centralized SCADA system.
Wind Generator: It comprises of group of wind turbines in the same location. Wind farms
vary in size from a small number of turbines to several hundred wind turbines covering an
extensive area. Various parameters, variables as mentioned below are monitored to review
the healthiness and performance of the Turbine on the centralized SCADA system.
i. Environmental parameters - Wind Speed, Wind Direction, Ambient & Nacelle
Temperatures etc.
ii. Electrical characteristics - Active & Reactive Power Output, Generator Voltages Current,
Frequency etc.
iii. Temperatures of various parts of turbine - Gearbox Bearing & Lubricant oil, Main
Bearing, Rotor Shaft, Generator Shaft, Generator Slip Ring, Inverter Phase, Transformer
Phase etc.
iv. Control variables - Pitch angle, Yaw Angle, Rotor Shaft Speed, Generator Speed, Fan
Speed / Status, Number of Yaw Movements, Set Pitch Angle / Deviation, Number of
Starts / Stops etc.
Inverter: A solar inverter or PV inverter, is a type of power inverter which converts the
variable direct current (DC) output of a photovoltaic (PV) solar panel into a utility frequency
alternating current (AC) that can be fed into a commercial electrical grid or used by a local,
off-grid electrical network.
SAS System: The typical SAS architecture shall be structured in three levels, i.e. Field level,
Bay level and Station level. The SAS provides an extensive range of Supervisory Control and
Data Acquisition (SCADA) functions.
Field Level, is at the switchyard level where instrument transformers, switchgear,
transformers/reactor are located and are hard wired to bay level equipment like IEDs
(Intelligent Electronic Device), BCU (Bay Control Unit) etc.
21
A bay comprises of one circuit breaker and associated disconnectors, earth switches and
instrument transformers. At Bay Level, the IEDs/BCUs provide all bay level functions
regarding control (command outputs), monitoring (status indications, measured values) and
protection. The bay level intelligent electronic devices (IED) for protection and control shall
provide the direct connection to the switchgear without the need of interposing components
and perform control, protection, and monitoring functions.
Each bay control IED is independent of the others and its functioning is not affected by any
fault occurring in any of the other bay control units of the station.
The data exchange between the electronic devices on bay and station level is realized through
optical fiber cables in dual redundant ring mode on IEC 61850 Protocol.
At Station Level, redundant server PC enables station control through the SCADA
package. The station level contains the station-oriented functions e.g., alarm list or event list
related to the entire substation, gateway for the communication with remote control centers or
respective load dispatch center.
At station level there is also Power Plant Controller (PPC servers) used to regulate and control
the networked inverters, devices and equipment at a solar PV plant in order to meet specified
set points and change grid parameters at the Point of Interconnect (POI). This enables fast and
stable control at the grid connection point.
Ethernet switches are provided for connecting the IEDs in the bay level catering the
requirements. The connection from each IED to the switch is by a single fiber optic link. The
switches are connected in a ring. At the station level, to provide communication redundancy,
two Ethernet switches are used to connect the redundant servers, Gateways, DR/EWS and
other station level equipment.
The alarms and events when required, reports and graphics will be printed on laser printer
connected to the system over the Ethernet LAN.
A dedicated GPS master clock is provided for the synchronization of the entire system. This
master clock is independent of the station computers and gateways, and it synchronizes all
devices via the-inter bay bus using SNTP protocol as defined by the IEC 61850 standards.
Weather Monitoring Station (WMS): Weather Monitoring Station is one of the most crucial
instruments installed in Solar PV / Wind Power plants. A weather monitoring station can be
immensely helpful in monitoring the efficiency and performance of any solar/ wind power
plant.
Photovoltaic (PV) system performance depends on both the quality of the system and the
weather. As the weather varies, the output of the PV system changes. The key factor affecting
the PV system performance is the solar radiation data. But along with solar radiation data, the
weather parameters like ambient temperature, relative humidity, wind speed, wind direction,
atmospheric pressure, and rain are the other important factors affecting the performance. The
22
data of all these sensors can be used to schedule the maintenance of the plant and to calculate
if the PV system is generating electricity as per the expectations.
The effective operation of the wind turbine is also dependent on the direction of the
wind. Speed air density, which in turn depends on the temperature and humidity. Thus, the
speed of the wind worked effectively in its composition must include the weather. Weather
monitoring station helps and prevents the healthiness of wind turbines. In case of increase in
wind speed above the maximum design value, WMS sends a signal to the lock assembly of
the wind turbine and stops the operation of the wind turbine in order to prevent any damage to
the wind turbine due to climatic change.
Power Plant Controller (PPC): The Power Plant Controller in a Wind Power Plant (WPP) is
an intelligent system for dynamic wind power plant control and grid code compliance in order
to
• Meet specified setpoints and change grid parameters at the point of interconnect (POI)
by regulating voltage, frequency, reactive power, active power, power factor and ramp
control.
• Control plant behavior in terms of grid stability, compliance, production levels and
revenue.
• Perform remote starts/stops or other troubleshooting actions on WTGs and other field
and substation equipment
Communication Protocol: For monitoring of RE plant data to load dispatch center, the
communication channel is realized through /OPGW (Optic Fibre Ground Wire) /PLCC (Power
Line Carrier Communication) in Secure IEC 60870-5-101/104 protocol. It may be noted that
communication channel using GPRS/GSM is not found reliable and suitable by many SLDCs.
Moreover, said data channel is also prone to cyber-attacks, hence communication channel
using GPRS/GSM should not be permitted due to cyber security reasons.
A dedicated REMC (Renewable Energy Management Center) server is installed at LDC
fetching the data of RE generators and forwards the same to SCADA system of LDC. At
present, there are 13 (thirteen) REMCs and some REMCs are co-located with SLDCs, while
remaining are co-located with RLDCs with NLDC at the top of hierarchy.
REMC systems are specialized SCADA systems deployed to cater exclusively to the
requirements of the integration and operation of Renewable Energy (RE) sources, which
include real time data acquisition, scheduling and forecasting of RE generation sources. The
REMCs are equipped with a Forecasting tool and provides generation forecasts for Solar and
Wind power generators and facilitates their scheduling and integration into the power grid. It
helps balance the intermittent nature of renewable energy generation with the demand for
electricity. The REMC collects, analyzes and manages data related to renewable energy
generation, consumption, and grid integration. It maintains necessary systems to ensure
accurate and up-to-date information on renewable energy resources and their utilization.
23
Data Communication is one way only for LDC, i.e., from RE station to LDC. The data
connectivity is through redundant gateway / RTU and dedicated firewall in high availability
mode. The gateway / RTU fetch data from SCADA LAN through firewall and provides the
required data to LDC on IEC 60870-5-101/104 protocol.
Interconnection with Enterprise IT System (Centralized Data collection center of Wind
Developer Company for data acquisition is an online (continuous), unit-directional
communication of generation data and this link is protected by using firewall and IPS at
Process Control Network end. The Enterprises IT system may be co-located or remotely
located. Only the services required for this communication are permitted in the firewall and
others are blocked. This connectivity provides data to the Central database for MIS purposes
only with one-way data flow i.e., from plants to MIS server (unidirectional) and no traffic is
allowed in to plant network.
For updations of system patches/software upgrades and antivirus definition etc. the patches
shall be downloaded in the Patch Management Servers located in the enterprise IT system and
then forwarded to respective servers located in the External DMZ. The forwarding of patches
to the servers in OT environment shall be scanned through firewall, IP/Port filters and access
rules governing such data exchange between the servers in two networks.
Architecture layouts for RE plants (with ON-Premise SCADA) are as under:
24
Annexure -1
Brief about each Article of CEA (Cyber Security in Power Sector) Guidelines, 2021
Article1: Cyber Security Policy.
What: The article states that an organization shall document, establish, approve by top
management, publish, communicate to relevant stakeholders the Organization Cyber Security
Policy. The organization shall also review the same at planned intervals and after occurrence of
significant changes.
Purpose of Article: The establishment of Organization wide Information Security Policy basically
sets out the organization’s approach to managing its information security of its OT /IT assets and
helps it in ensuring effectiveness of management direction/security controls/business continuity
plans in accordance with business, legal, statutory, regulatory and contractual requirements.
Major Requirements of Article1
i. There must be hard isolation between OT Systems from any internet facing IT Systems.
ii. The communication to OT environment must be through a firewall allowing only the
approved list of whitelisted IP / Port addresses.
iii. Formulation of topic specific policies for ensuring access control to Cyber Assets owned
or controlled by the utility.
iv. Sourcing of all ICT based equipment/systems deployed in infrastructure/system
mandatorily CII from the list of “Trusted Sources”.
v. The utility shall be ISO/IEC 27001 certified (including sector specific controls as per
ISO/IEC 27019).
vi. Communication between OT equipment / systems must be realized through secure
communication channel preferably of PowerTel through Optic Fibre Cable.
vii. Ensuring to take up the cyber security issues as agenda items in utility’s Board Meetings
once in every quarter.
Article2: Appointment of Chief Information Security Officer (CISO).
What: The article states that a utility shall mandatory appoint a responsible authority, namely a
CISO and an Alternate CISO. The roles and responsibilities of the CISOs shall be to ensure the
cyber security of the Cyber Assets of the utility.
Purpose of Article: CISO’s appointment is required to steer the implementation of Cyber Security
Policy as well as to lead the Information Security Division, a division which need to execute
various cyber security activities required for protecting Cyber Assets of the Utility.
Major Requirements of Article2
i. Mandatory appointment of a CISO (Chief Information Security Officer) and an Alternate
CISO.
ii. Conformance to the qualification standards of CISO, if any, laid by the Quality Council of
India (QCI).
25
iii. Acquisition of minimum required cyber security skill sets by the Alternate CISO within
six months from the date of his appointment.
iv. Regular updating of the details of the CISO and Alternate CISO by the Utility with the
Sectoral CERTs as well as on the ISAC Portal.
v. CISOs to comply with the roles and responsibilities laid by the CERT-In with focus to
ensure the cyber security of the Cyber Assets of the Utility.
Article3: Identification of Critical Information Infrastructure (CII).
What: The article states that a utility shall mandatorily identify its Critical Information
Infrastructure by submitting the details of its Cyber Assets employed in its Critical System to
NCIIPC within 30(thirty) days from the date of their commissioning in the Critical System.
Purpose of Article: To protect and safeguard the Critical Assets which are within the purview of
the utility and are such facilities, systems and equipment which, if destroyed, degraded or
otherwise declared unavailable, would affect the reliability or operability of the Power Supply
System. CII protection helps in avoiding any debilitating impact on National Security, Economy,
Public Health or Safety.
Major Requirements of Article3
i. Mandatory identification of CII by submitting to the NCIIPC through the Sectoral CERT,
the details of those Cyber Assets which are employed in its Critical Systems such that the
Cyber Asset uses a routable protocol to communicate both outside the Electronic Security
Perimeter or within control centre and also when such Cyber asset is dial up accessible.
ii. The utility shall submit the details of Critical Business Processes and underlying
information infrastructure along with the corresponding impact and Risk Profile to
NCIIPC.
iii. The utility shall review their declared/notified CIIs at least once a year to examine changes
if any in the functional dependencies, protocols and technologies or upon any change in
security architecture.
iv. The utility shall review their declared/notified CIIs once in every 6 months, in case if
NCIIPC has directed them to constitute an Information Security Steering Committee
Article 4: Electronic Security Perimeter (ESP).
What: The article states that a utility shall identify and document the ESP(s) and all Access Points
to such perimeter(s) and shall also ensure that every Critical System resides within an ESP.
Purpose of Article: To protect the Critical Asset from possible Cyber Attacks by dividing &
segregating the network into logical domains/zones, also known as ESPs. The inter ESP access, if
allowed, must be through perimeter security devices.
Major Requirements of Article 4
i. The utility shall perform a cyber-Vulnerability Assessment of each electronic Access
Points to the Electronic Security Perimeter(s) at least once in every 6 (six) months and/or
after any change in Security Architecture.
26
ii. The utility shall ensure that all critical, high and medium vulnerabilities identified as a
result of cyber–Vulnerability Assessment shall be closed and verified for the effective
closure.
iii. The Responsible Entity shall follow procedure of identifying “Electronic Security
Perimeter” in case of distributed and/or hybrid information infrastructure, as per IEC 62443
/ IS16335 (as amended from time to time).
Article 5: Cyber Security Requirements.
What: The article states that a utility shall form an Information Security Division (ISD) to be
headed by the CISO of the utility. The article also states the functions of the ISD as well as other
cyber security requirements for ensuring the cyber security of Critical Systems.
Purpose of Article: Articulation of various cyber security requirements for ensuring the security
of Critical Systems by way of mandatory formation of an ISD, stating various functions of ISD,
suggestions for designing a secure network architecture of the OT/IT systems etc.
Major Requirements of Article 5
i. Onboarding of Public IPs of utility with the Cyber Swachhta Kendra (CSK) of Cert-In.
ii. Deployment of Intrusion Detection System and Intrusion Prevention System for detection
of behavioral anomaly in both IT &OT systems.
iii. Updating of firmware/software with digitally signed OEM validated patches.
iv. Maintenance logs of firewalls for a period of six months.
v. Enabling only those ports and services that are required for normal operation.
vi. Designing of a secure architecture for control system as per IEC 62351-10
vii. Retaining Cyber logs and cyber forensics records of an incident for at least 90 days.
viii. Timely acting upon the advisories, guidelines and directives of NCIIPC, CSK, Cert-In and
Sectoral CERTs.
ix. Retaining document of FAT, SAT test results and report/ certificate of cyber tests carried
out for compliance of Government Orders and Cyber Security Audit.
Article 6: Cyber Risk Assessment and Mitigation Plan (CRMP).
What: The article states that a utility shall conduct a Cyber Risk Assessment & Mitigation plan for
identification & mitigation of the threats to and vulnerabilities in the Critical Systems by
considering the likelihood and adverse impact of unauthorized access/breach of Critical Systems.
Purpose of Article: To contribute in providing assurance about privacy, security of Critical
Systems through appropriately selected security controls & risk mitigation measures in place.
Major Requirements of Article 6
i. The Cyber Risk Assessment and Mitigation Plan shall be approved by the BOD of the
utility.
ii. The CRMP shall assess the cyber risks of both IT and OT environment and risk acceptance
criteria.
iii. The utility shall review the CRMP at least once in a quarter.
27
Article 7: Phasing out of legacy System.
What: The article states that utility shall draw a replacement plan for phasing out of those identified
legacy Communicable Equipment/ Systems which are nearing end of life or are left without
support from the OEM. The article also mandates developing a procedure for safe and secure
disposal of such outlived or legacy systems/devices.
Purpose of Article: To address the cyber security concerns associated with legacy systems in use
through development of procedures for hardening of such assets by integrating additional controls
in consultation with OEMs or alternate suppliers as well as through establishing SOPs for their
safe & secure disposal in phased manner.
Major Requirements of Article 7
i. The Utility shall ensure that the Information Security Division shall draw the list of all
communicable equipments/systems nearing end life or are left without support from OEM.
Thereafter CISO shall identify equipment/systems to be phased out from the list drawn,
firm up their replacement plan and put up the replacement plan for approval before the
Board of Directors.
ii. The CISO shall ensure that till equipments /systems nearing end life or left without support
from OEM are not replaced, their cyber security is hardened and ensured through additional
controls provisioned in consultation with the OEM or alternate Supplier(s)*.
iii. The Utility shall document in their Cyber Security Policy a Standard Operating Procedure
for safe and secure disposal of outlived or legacy devices.
Article 8: Cyber Security Training.
What: The article states that utility shall document, establish, maintain and review an annual cyber
security training program for its personnel authorized to work with critical systems. The article
also states that all personnel engaged in O&M of IT & OT Systems shall mandatorily undergo
courses on cyber security of Power Sector.
Purpose of Article: To train and make aware the authorized personnel about relevant cyber
security topics and also to ensure that personnel fulfill their cyber security responsibilities.
Major Requirements of Article 8
i. The Utility shall review annually their cyber security training program and shall update it
whenever necessary. Annual Review shall record evaluation of the effectiveness of the
trainings held.
ii. All Personnel engaged in O&M of IT & OT Systems shall mandatorily undergo courses
on cyber security of Power Sector from any of the training institute designated by CEA,
immediately within 90 days from the notification of CEA Guidelines on Cyber Security in
Power Sector.
28
iii. The Utility shall ensure that none of their newly hired or the current Personnel have access
to the Critical System, prior to the satisfactory completion of cyber security training
programme from the Training Institutes designated in India, except in specified
circumstances such as cyber crisis or an emergency.
Article 9: Cyber Supply Chain Risk Management.
What: The article states various provisions for addressing the concerns related to Cyber Supply
Chain Risk Management i.e., Provision for inclusion of MCC in every bid document for
procurement, mandating such procurement from “Trusted Sources”, getting such procured product
tested, from designated labs in India for the embedded Malware/Trojan/Cyber Threats and
adherence to Indian Standards.
Purpose of Article: The article tries to ensure the cyber security requirements for Secure product
development processes as well as Secure Supply Chain management practices for avoiding the
deployment of counterfeit and maliciously tainted products in the Power Supply System through
various checks at different phases of product procurement and commissioning.
Major Requirements of Article 9
i. The Utility shall ensure that, as and when Ministry of Power, Government of India notifies
the Model Contractual Clauses on cyber security, these clauses are included in their every
Bid invited for procurement of any ICT based components/equipment’s/System to be used
for Power System.
ii. The Utility shall ensure that all the Communicable Intelligent Equipment’s and the Service
Level Agreements (SLAs) for their Critical Systems shall be sourced from the list of the
“Trusted Sources” as and when drawn by MoP/CEA.
iii. The Utility shall ensure that, in case, for the any Communicable Intelligent Devices, if no
Trusted Source has been identified, then the successful bidder in compliance with the
provisions made in MoP order dated 2.7.2020 and any other relevant MoP order has got
the product cyber tested for any kind of embedded malware/Trojan/cyber threat and for
adherence to Indian Standards at the designated lab.
iv. The Utility shall ensure that the essential cyber security tests are carried out successfully
during FAT, SAT as detailed in Annexure A. The equipment/System besides for
functionality shall also be tested in the factory for vulnerabilities, design flaws, parts being
counterfeit or tainted, so as to minimize problems during on-sitetesting and installation.
Cyber Security Conformance Testing are to be carried out in the designated Lab as listed
in Annexure-I of MoP Order No. 12/13/2020-T&R dt. 8th June, 2021(Order at Annexure-
B).
v. The Utility shall ensure that the Equipment/System supplied by the successful bidder shall
accompany with a certificate$, obtained by OEM from a certification body accredited to
assess devices and process for conformances to IEC 62443-4 standards during design and
manufacture. The Utility shall accept the certificate submitted along with the supplied
Equipment/System only if it’s in line with the Testing Protocol as notified by Ministry of
Power, Government of India, from time to time.
29
vi. The Utility shall dispose all unserviceable or obsolete Communicable Intelligent Devices
as per the procedure laid in their Cyber Risk Assessment and Mitigation Plans which shall
be in line with the prevailing best practices.
Article 10: Cyber Security Incident Report and Response Plan.
What: The article articulates the requirements of establishing a Cyber Security Incident Response
Plan by covering its various aspects including identification of various criteria(s) based on their
impact analysis for declaring the occurrence of such cyber incident(s) as Cyber Crisis, designating
an authority to declare an incident as cyber crisis, ways of handing of an incident, reporting the
same in prescribed formats to regulatory authorities like Cert-In/NCIIPC etc.
Purpose of Article: To guide the utilities in preventing, detecting, responding a cyber incident in
a structured & matured way with least impact on their critical business functions.
Major Requirements of Article 10
i. Root cause analysis for all reportable events shall be carried out and corrective action taken,
so as to ensure that any re-occurrence of such event can be managed with ease.
ii. The CISO shall ensure that during any Cyber Security Incident, ISD monitors and minutely
records every detail of cyber security events and incidents in both IT as well as the OT
System owned or controlled by the Utility.
iii. The Utility shall ensure that the efficacy of the Cyber Security Incident Response Plan is
tested annually through mock drill(s) carried out, if feasible, as simulation exercise(s) or
as table top exercise(s) with wider participation of their employees, in consultation with
CERT-In and sectoral CERT. In case if any shortcoming is observed in the Cyber Security
Incident Response Plan suitable changes shall be made in it.
Article 11: Cyber Crisis Management Plan (C-CMP).
What: The article mandates a utility to prepare a Cyber Crisis Management Plan and states the
process for its implementation, management including enforcement and review.
Purpose of Article: To guide the utilities in defining roles & responsibilities for a coordinated,
approach to prepare for rapid identification, information exchange, response, and remediation to
mitigate and recover from malicious cyber related incidents impacting their critical business
functions and processes.
Major Requirements of Article 11
i. The Utility shall prepare a Cyber Crisis Management Plan and submit to their sectoral-
CERT for review with intimation to Ministry of Power/CISO-MoP. Utility shall update
their C-CMP on the basis of comments made by sectoral-CERT and then submit for vetting
to CERT-In. The C-CMP shall be updated once again to include the observations made by
CERT-In before seeking approval of Board of Directors for implementation of C-CMP.
30
ii. The Utility shall ensure that the C-CMP is reviewed at least annually. The CISO shall
ensure that all changes are made in C-CMP only with the due approval of Board of
Directors and the changes made in C-CMP have been communicated through a verifiable
means to all the concerned Personnel of the Utility.
iii. The CISO shall be accountable for ensuring enforcement of C-CMP by Information
Security Division of the Utility, during a cyber-crisis, as and when declared by the
designated Officer.
Article 12: Sabotage Reporting.
What: The article states the requirements for a utility to prepare a procedure for identification and
reporting of sabotage on their Critical Systems. It also states the action to be taken in the event of
occurrence of any sabotage.
Purpose of Article: To protect the CIIs from any disturbances or unusual occurrences identified,
suspected or determined to be caused by a sabotage.
Major Requirements of Article 12
i. The CISO shall be held liable for non-reporting of identified sabotage(s) as per procedure
laid for identifying and reporting of sabotage in the Cyber Security Policy of the Utility.
ii. The CISO shall submit to NCIIPC within 24 hours of occurrence the report on every
sabotage classified as cyber incidents(s) on "Protected System".
iii. The CISO upon occurrence on every sabotage shall take custody of all log records as well
as digital forensic records of affected Cyber Assets, Intrusion Detection System, Intrusion
Protection System, SIEM and shall preserve them for at least 90 days and shall make them
available as and when called upon for investigation by the concerned Agencies.
Article 13: Security and Testing of Cyber Assets.
What: The article states that the utility shall obtain the information about technical vulnerabilities
of its in-service phase as well as standby Cyber Assets, evaluate the utility’s exposure to such
vulnerabilities, and take appropriate actions like regular firmware/Software updates and patching,
Vulnerability Management, Penetration Testing etc.
The article also states that all Communicable Devices are to be tested for Communication Protocol
conformance before being deployed in Power Supply System.
Purpose of Article: To prevent exploitation of technical vulnerabilities of Cyber Assets.
Major Requirements of Article 13
i. The Utility shall carry out regularly Vulnerability Assessment of all Cyber Assets owned
or under their control. If a Cyber Asset is found vulnerable to any exploits or upon any
patch updates or major configuration changes, then further Penetration Testing may be
carried out offline or in a suitably configured laboratory test-bed to determine other
vulnerabilities that may have not been identified so far.
31
ii. The Utility shall ensure that all Communicable devices are tested for communication
protocol as per the ISO/IEC/IS standards listed in MoP Order No. 12/13/2020-T&R dated
8th June, 2021.
iii. The Utility shall ensure that all Critical Systems designed with Open-Source Software are
adequately cyber secured.
iv. The Utility as a best practice upon any incidence of Cyber Security Breach shall carry out
cyber security tests at any lab designated for cyber testing by Ministry of Power. These
tests shall be similar to Pre-Commissioning Security Test and those essential for carrying
out Post Incident Forensics Analysis.
Article 14: Cyber Security Audit.
What: The article states that the utility shall implement the Information Security Management
System (ISMS) covering all its Critical Systems. Moreover, the utility shall also get their IT as
well as OT systems audited as per ISO/IEC 27001 along with sector specific standard ISO/IEC
27019, IS 16335 standards and other guidelines.
Purpose of Article: To identify, improve, assure a utility about cyber security preparedness of its
Critical Systems through application of adequate controls of ISO/IEC 27001 standard.
Major Requirements of Article 14
i. The Utility shall implement Information Security Management System (ISMS) covering
all its Critical Systems.
ii. The Utility shall through a CERT-In Empaneled Cyber Security OT Auditor shall get their
IT System audit at least once in every 6(months) while OT System audited within every 12
(twelve) months and shall close all critical and high vulnerabilities within a period of one
month and medium as well as low non-conformity before the next audit. Effective closure
of all non-conformities shall be verified during the next audit.
iii. The Utility shall ensure that CISO has all the required systems and documents in place, as
mandated by NSCS for base line cyber security audit.